Installation Method of High Precision Linear Guideway (II)

2023-08-25

The general installation method was mentioned earlier, and this article mainly explains the method of installing Pengyin Precision Linear Guides (PYG, SLOPES) without lateral screws.

1、 Installation of reference side linear guide rail

Firstly, use the assembly screw edge to roughly fix the bottom reference plane of the linear guide rail to the assembly surface at the bottom of the machine. Then, use a vice to press the side base surface tightly against the assembly surface at the side of the machine. After locking the position of the linear guide rail, use a certain amount of torque to sequentially lock the fixed screw edge, and press the bottom reference plane of the linear guide rail tightly against the assembly surface at the bottom of the bed.



 

2、 Installation of linear guide rail on the driven side

1. Mobile Platform Method

Fix the two sliding blocks on the reference side on a measuring platform, while only one sliding block is installed on the driven side. At this time, both the linear guide rail and the sliding block have not been fully locked on the machine. Use a micrometer attached to the top surface of the driven side sliding block to measure the side reference plane of the driven side sliding block. Start from one end of the linear guide rail and calibrate it to lock the assembly screws with specific torque in sequence.




2. Imitate the base side sliding rail method

Fix the two sliders of the reference side linear guide rail and one of the sliders of the driven side guide rail to the platform, and then roughly fix the slide rail of the driven side and the other slide rail to the bed and platform respectively. Move the platform based on the reference side slide rail. Starting from one end of the slide rail, confirm the rolling resistance of the driven side linear guide rail while locking the assembly screws with specific torque in sequence.



 

3. Linear block gauge method

Place the linear block gauge between two linear guide rails, use a micrometer to calibrate the linear block gauge so that it is parallel to the side reference plane of the reference side slide rail, and then calibrate the driven side slide rail according to the linear block gauge. Start calibrating one end of the driven rail and lock the assembly screws with a specific torque in sequence


 
 

4. Special tool method

Use a special tool to determine the position of the driven side slide rail and lock the assembly screws with specific torque in sequence


 
The next article will continue to demonstrate the installation of assembly surfaces without lateral positioning

猜您喜欢的内容

We provide you with the following service process

Pre sales consultation

Provide detailed specifications of products for you to choose from

Product customization

Diversified specifications and sufficient inventory

Installation guidance

Provide guide for the use and installation of guide rails

Logistics delivery

Immediately arrange picking after placing an order, ensuring quality

After-sales Consulting

Promptly answer any product after-sales questions for you

Adhering to the spirit of craftsmanship and relying on excellent technical strength
Committed to providing you with better linear guide rail series products

Home -  Product -  Honor -  Workshop -  About -  News

Company Address
浙江省嘉兴市海盐县武原街道桑德兰路8号

Service hotline
199 5731 6665